Mr Lim says that by 2020, the aim is to allow commuters in the city to reach an MRT station within a five minute walk. In the second part of the Land Transport Review, Transport Minister Raymond Lim announced the changes in the rail industry, which includes doubling the current rail network. The government will spend another 20 billion dollars to build two more MRT Lines and extend the current MRT network. Government to pump in $20 billion to improve MRT network All I know is that this part B of TSL is about 14.5km. This time round LTA did not provide the indicative track alignment. T9: Interchange (This station will interchange with an existing line) ->Interchange will be using paid to paid link T7: Interchange + CD (This station will interchange with a future line, so this station will be just a normal CD station initially) -> Interchange will be cross platform. T4A: Future station (Why is the code T4A? I have no idea) Instead a station box will be placed for the future) T4: Future Station (Note: It means stations that are not going to be built. This Mainline Package B consists of 8 stations:įrom the tender document : (Mainline Package B 14.5km) More information for you all :Īs you know from previous Mainline package A(4.2km) it consists of 3 stations and a depot (1 interchange, 2-non CD station)-> As you all know i uploaded the indicative track alignment.(Check previous post) Ok, today LTA released its TSL Mainline Package B on the tender site.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |